MILNER MILLING
BIRMINGHAM, ALABAMA

FLOUR MILL EXPANSION 2008: 5,000 CWT LINE B ADDITION

  1. Contractor/Engineer: Todd & Sargent, Inc., Ames, Iowa

  2. Summary of Project Features - 2008:
    • The new Line B will have the capacity to produce 5,000 CWT of flour per day.
    • The slipformed mill is 21' wide, 54' long and 93' tall.
    • Todd & Sargent installed all the Buhler milling equipment.
    • Rail receiving and rail and truck loadout.
    • New high speed rail unloading system - 50,000 BPH.
    • 1,000,000 bushel slipformed wheat silos with hopper bottoms.
    • New wheat midds silo with Laidig unloader - 36' diameter x 92' high.
  3.