AURORA WEST
AURORA, NEBRASKA

CORN HANDLING FACILITY ROUTING CORN TO AVENTINE ETHANOL
- Contractor/Engineer: Todd & Sargent, Inc., Ames, Iowa
- Summary of Project Features:
- Receiving & Shipping Systems:
- Truck Receiving rated at 30,000 BPH via four 10' x 28' truck pits.
- Rail Loadout rated at 60,000 BPH via a bulkweigher.
- Rail Receiving at 50,000 BPH.
- Bin Aeration and Temperature Detection Systems.
- Truck Loadout System rated at 7,500 BPH.
- Receiivng/loadout dust control filter and fan.
 
- Slipformed Concrete Elevator
- 961,000 bushels in six 42'-0" diameter x 140'-0" tall bins and two interstices.
- 500# manlift in enclosed shaftway.
- Support Systems:
- Complete Plant Automation.
- Electrical Installation.
- Facility Control Office.
- Receiving Building.
 
|