AURORA COOP
AURORA, NEBRASKA

SHUTTLE TRAIN LOADING FACILITY WITH SERVICE TO TWO ETHANOL PLANTS
- Contractor/Engineer: Todd & Sargent, Inc., Ames, Iowa
- Summary of Project Features:
- Receiving & Shipping Systems:
- Transfer belt conveyor from existing receiving system rated at 30,000 BPH.
- Luft Kanal Bin Aeration/Reclaim System
- Gravity eccentric silo discharges direct to 30,000 BPH annex leg.
 
- Slipformed Concrete Elevator:
- 588,360 bushels in two 58'-0" diameter x 140'-0" tall bins.
 
- Support Systems:
- Complete Plant Automation.
- Electrical Installation.
 
|