UNITED GRAIN GROWERS
Congress, Saskatchewan

GRAIN ELEVATOR
- Contractor/Engineer: Todd & Sargent, Inc., Ames, Iowa
- Summary of Project:
- Receiving & Shipping Systems:
- Truck receiving rated at 15,000 BPH.
- Top transfer from existing at 20,000 BPH.
- Two track rail loadout rated at 30,000 BPH each with future 3rd track.
- Shipping Pre-weigh System.
- Existing Rail Car Moving System.
- Transfer system rated at 20,000 BPH back to existing.
- Receiving and transfer bulkweighers rated at 15,000 BPH each.
- Primary and secondary grain cleaning.
 
- Slipformed Concrete Elevator
- 600,000 bushels of storage in 14 bins.
- 38,900 bushels of cleaning storage in 14 bins.
- 7,500 bushels of pre-weigh storage.
- 55 tonne per hour grain drying system.
- Single dust system.
 
- Support Systems
- Complete Plant Automation.
- Electrical Installation.
- Facility Control Office.
- Receiving and Loadout Buildings.
 
|