UNITED GRAIN GROWERS
Congress, Saskatchewan

GRAIN ELEVATOR

  1. Contractor/Engineer: Todd & Sargent, Inc., Ames, Iowa

  2. Summary of Project:
    • Receiving & Shipping Systems:
      • Truck receiving rated at 15,000 BPH.
      • Top transfer from existing at 20,000 BPH.
      • Two track rail loadout rated at 30,000 BPH each with future 3rd track.
      • Shipping Pre-weigh System.
      • Existing Rail Car Moving System.
      • Transfer system rated at 20,000 BPH back to existing.
      • Receiving and transfer bulkweighers rated at 15,000 BPH each.
      • Primary and secondary grain cleaning.
    •  
    • Slipformed Concrete Elevator
      • 600,000 bushels of storage in 14 bins.
      • 38,900 bushels of cleaning storage in 14 bins.
      • 7,500 bushels of pre-weigh storage.
      • 55 tonne per hour grain drying system.
      • Single dust system.
    •  
    • Support Systems
      • Complete Plant Automation.
      • Electrical Installation.
      • Facility Control Office.