CPI-LANSING, LLC
FAIRMONT, NEBRASKA

SHUTTLE TRAIN LOADING FACILITY
- Contractor/Engineer: Todd & Sargent, Inc., Ames, Iowa
- Summary of Project:
- Receiving & Shipping Systems:
- Two truck receiving systems rated at 30,000 BPH each.
- Rail loadout rated at 60,000 BPH via a bulkweigher.
- Dual 30,000 BPH top fill distribution conveyors.
- Receiving/loadout dust control filter and fan.
 
- Slipformed Concrete Elevator - 1,250,000 Bushel Workhouse
- Eight 42' diameter x 130' tall bins.
- Luft Kanal System.
- 500# manlift in enclosed shaftway.
 
- 750,000 Bushel Steel Bin
 
- 7,500 BPH Dryer System
 
- Support Systems
- Complete Plant Automation
- Electrical Installation
- Facility Control Office
- Receiving Building
 
|