CPI-LANSING, LLC
FAIRMONT, NEBRASKA

SHUTTLE TRAIN LOADING FACILITY

  1. Contractor/Engineer: Todd & Sargent, Inc., Ames, Iowa

  2. Summary of Project:
    • Receiving & Shipping Systems:
      • Two truck receiving systems rated at 30,000 BPH each.
      • Rail loadout rated at 60,000 BPH via a bulkweigher.
      • Dual 30,000 BPH top fill distribution conveyors.
      • Receiving/loadout dust control filter and fan.
    •  
    • Slipformed Concrete Elevator - 1,250,000 Bushel Workhouse
      • Eight 42' diameter x 130' tall bins.
      • Luft Kanal System.
      • 500# manlift in enclosed shaftway.
    •  
    • 750,000 Bushel Steel Bin
    •  
    • 7,500 BPH Dryer System
    •  
    • Support Systems
      • Complete Plant Automation
      • Electrical Installation
      • Facility Control Office
      • Receiving Building
    •