NORTHERN CROSSING LLC
Mendota, Illinois

SHUTTLE TRAIN LOADING FACILITY
- Contractor/Engineer: Todd & Sargent, Inc., Ames, Iowa
- Summary of Project:
- Receiving & Shipping Systems:
- Truck receiving rated at 40,000 BPH.
- Rail loadout includes a retractable/pivoting spout rated at 60,000 BPH.
- Facility capable of loading out 320,240 gravity bushels.
- 50,000 BPH shipping bulk weigher.
- 22,000 BPH cleaning system.
- 12’ x 70’ remote truck scale.
- Annex bins gravity discharge at 40,000 BPH by PM-Luft Kanal for cleanout.
- Truck receiving pit dust control system rated at 19,500 CFM.
- Remote Truck Sample Probe.
- Mineral Oil Application System.
 
- Slipformed Concrete Elevator
- 900,000 bushels of storage in 5 bins.
- Blending and screenings storage bins.
- 500# Manlift in enclosed shaftway.
 
- Support Systems
- Complete Electrical and Plant Automation.
 
|