  1. Contractor/Engineer: Todd & Sargent Canada, Ltd.

  2. Summary of Project Features:
    • Demolition, Retrofit and New Equipment Installation
      • Remove existing relcaim equipment, top transfer drag and distributor, supports, spouting and bridge.
      • Extend receiving and shipping bucket elevator.
      • Install two (2) new gate valves and a lined u-trough to existing bulkweigher.
      • Two (2) new 12,000 BPH transfer drag conveyors from each leg to the new dual inlet distributor.
      • Install a new "Schlagel" dual inlet, 24-duct, electric distributor.
      • Install new 24,000 BPH reclaim drag and retrofit gate valves to both legs.
      • Install new dust collection baghouse and support structural.
    •  
    • Structural Supports & Access, Miscellaneous
      • Install a new structural support bent and top transfer drag bridge.
      • Install new access to the receiving leg and shipping leg extensions.
      • Install a new electric 500# capacity manlift and steel shaftway.