BUNGE NORTH AMERICA
ROSE HILL, NORTH CAROLINA

NEW SOYBEAN MEAL RAIL TO TRUCK TRANSLOADING FACILITY
- Contractor/Engineer: Todd & Sargent, Inc., Ames, Iowa
- Client Data: Bunge North America, with engineering headquarters located in St. Louis, Missouri.
- Summary of Project Features:
- Rail Receiving System:
- Rail receiving conveyors rated at 400 TPH, designed to unload 90 car unit trains carrying 9,750 tons..
- One 400 TPH receiving bucket elevator.
 
- Soybean Meal Storage Bins
- Two slipformed silos, 55' diameter x 130' high.
- 10,000 tons of soybean meal storage.
- Above grade reclaim tunnels.
- Flat floored with Laidig bin unloader.
- Two 235 TPH unloaders to feed 470 TPH reclaim conveyor.
 
- Truck Loadout System
- One 400 TPH loadout bucket elevator.
- One 100 ton capacity "overhead" loadout bin.
- Meal Sampler System.
- Truck loadout scale - 10' x 110' long.
- Support Systems
- Complete plant automation, electrical and mechanical installation.
- Pre-engineered meetal buildings for rail receiving and truck loadout.
 
- Scheduled Completion: December 2010.
 
|