INLAND GRAIN TERMINAL

1. Contractor/Engineer:  Todd & Sargent, Canada, Ltd.

2. Client Data:   Parrish and Heimbecker, Limited is a private, family owned business, founded in 1909. It is involved in many aspects of agri-business including grain procurement and merchandising, milling, animal nutrition programs, poultry farming and food processing.

3. Summary of Project:
A. Slipformed Concrete Elevator
  • 340,000 bushels of storage in 20 bins with 9 on 12 slickcoat hoppers.
  • Two bucket elevators, two transfer drags, and top double distributor, each rated at 20,000 BPH distribution for elevator bins, cleaner system, future flat storage, and future annex tanks.
  • Reclaim from future storage, rated at 20,000 BPH.
  • 40,000 BPH elevator reclaim belt conveyor fed by proportioning gates.
B. Receiving & Shipping Systems:
  • Truck Receiving rated at 20,000 BPH with 10’ x 110’ aspirated “dump-thru” truck scale incorporating a 6’ x 54’ dump grate.
  • Truck loadout and audit recirculation spout rated at 20,000 BPH.
  • Three track rail loadout rated at 40,000 BPH.
   • 40,000 BPH Shipping Bulk Weigher with 50 tonne upper garner.
   • 40,000 BPH Sampling System
  • Railcar Reclaim System rated at 10,000 BPH.
C. Auxiliary Systems
  • Facility and Cleaner Dust Systems with 4,000 CF dust loadout bin.
  • Erect pre-engineered metal buildings for Receiving Control Office, Cleaning Enclosure, and Rail Loadout Booth.
  • 650# capacity manlift with stops at grade, bulkweigher, and bin deck.
  • Considerations for future Dryer System.

Project Name: 
Inland Grain Terminal

Client Name: 
Parrish & Heimbecker
Industry: 
Grain
Location: 
Gladstone, MB

Share this project