« View all projects
Project Description
Summary of Project:
- Receiving & Shipping Systems:
- Truck receiving rated at 30,000 BPH.
- Rail loadout includes a retractable/pivoting spout rated at 60,000 BPH.
- Facility capable of loading out 172,000 gravity bushels.
- Shipping Bulk Weigher.
- Cleaning System with future scalping system.
- Future Bin Aeration and Temperature Detection Systems.
- 10' x 70' Remote Truck Scale.
- Annex bins include 2,000 BPH bin sweeps for final cleanout.
- Transfer system rated at 30,000 BPH.
- Truck receiving pit dust control system rated at 18,000 CFM.
- Dustmaster Rail Receiving Pit Dust Control System.
- Remote Truck Sample Probe.
- Mineral Oil Application System.
- Slipformed Concrete Elevator
- 906,000 bushels of storage in 5 bins.
- Blending and Fines Storage Bins.
- 500# Manlift in enclosed shaftway.
- Support Systems
- Complete Plant Automation.
- Electrical Installation.
- Facility Control Office.
- Receiving Building.
- Rail loadout building with fall restraint system.
Project Name: Shuttle Train Loading Facility
Client Name:
Landmark Services Cooperative
Industry:
Grain
Location:
Evansville, WI